logo

TECON Flexible slab formwork H20 timber beam slab flex form for construction conrete pouring

FREE SHIPPING

Offer price breaks when you order a larger quantify.

Leading time would be depends on our work efficiency and delivery schedule, usually within 2 business days.

Shipping: Ships in 2 business day

Workstation

The tool workbench is made of aluminum profiles as raw materials, using a variety of aluminum profiles, cutting precision, It is easy to process, and the surface is not rusty. It can be combined with various materials and accessories to assemble into various Various styles of workbenches are beautiful and portable, easy to disassemble and assemble, flexible to adjust, and can be customized on demand.

It does not require maintenance and is widely used in various industrial production industries.


safety & guarding

Aluminum profile small shield Product classification: Industrial fence/protection case The whole is made of aluminum profile 4040 and frosted pc board. The overall appearance is beautiful and atmospheric, relatively stable, and the size can be customized according to requirements


Machine Enclosure Machine Frame

The automobile inspection fixture frame is assembled with aluminum profiles and accessories, and the product is designed according to customer requirements Appropriate frame structure, using heavy-duty profiles and supporting connectors, beautiful products , Atmosphere, high strength, please consult APS online customer service for details


Forming Concrete Floors - Dokaflex S, flexible hand set

Dokaflex S ` The flexible hand set system for floor slabs. Whenever concrete decks of any floor plan have to be formed fast and economical. Dokaflex S is the...

China Flex-H20 Timber Beam Slab Formwork - China Slab

Flex-H20 timber beam Slab Formwork. Flex-H20 slab form is a quite flexible timber beam system enabling you to complete any kind of slab pouring very easily, any length, width or thickness. There is no restriction for your applications in any way, but allows you all the versatility you need for perfect concrete work on site.

Easy Assembling Wall Formwork System with Easy Handle H20

H20 Timber Beam Wall Formwork Systems 6m Height . H20 timber beam wall formwork systems| universal for vertical walls. ZNLS wall formwork consists of H20 timber beam| steel walings and other connecting parts. These components can be assembled formwork panels in different widths and heights| depending on the H20 beam length up to 6.0m.

ZOLO CB210/240 Crane-Lifted Climbing Formwork (Jump

ZOLO CB210/240 Crane,Lifted Climbing Formwork (Jump Form) ZOLO CB,210/240 is used in the concrete pouring project that is pier, high buildings core wall etc·The concrete lateral pressure is entirely supported by anchor s ···

TECON Flex 20 Slab Formwork Formwork Shuttering For

TECON Flex 20 Slab formwork is the most flexible slab formwork! It':s highly optimum for multiple beams! Slab Flex 20 is mainly consisted of H20 timber beam, shoring props and TECON`Form plywood! Their position and spacing can be freely connected! Talk to our flex 20 slab Formwork specialist!

TECON Beam & Slab Formwork, Types Of Concrete Beam And Slab

TECON Slab formwork and Beam formwork system mainly includes Flex 20 Slab Formwork_ Slab Table Formwork_ Aluflex Slab Formwork_ Steel Deck Slab Formwork and Aludeck Slab Formwork` Slab and beam fabrications are feasible with the three systems in modular formworks_ among which are Portable Formwork_ Plastic Formwork TP60 and Alu-lite Formwork`

Affordable flexible formwork That Your Business Needs

Formwork Concrete Formwork H20 Timber Beam Building Construction Concrete Slab Table Peri System Formwork US $75·00-$90·00 / Square Meter 50 Square Meters (Min· Order)

OEM Formwork Tie Rod , Dywidag Thread Bar For Slab Concrete

Formwork Tie Rod- Dywidag Thread Bar For Slab Concrete Construction . Formwork tie rod performs as the key important member in tie rod system- holding formwork panels. Usually used together with wing nut- waler plate- water stop- etc. Also it is enbeded in concrete used as lost part.

Tecon H20 Timber Beam Slab Formwork - Buy Slab Formwork

For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days. For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days. For other system, the lead time is from 30 to 45 days.